This pre line plumbing and build quality checklist helps verify workmanship and compliance before wall linings are installed. It covers pipe support and protection, taping around penetrations, ensuring no pipework sits in cavities, hot water cylinder tray checks, pressure testing at 1500 kPa for 30 minutes, stack system water tests, and roof vent sleeves. Build QA items include framing moisture within limits, complete insulation per specifications, engineer detail checks, secured and sealed windows and doors with protective coverings, bath packing and surrounds, safety glass verification, site cleanliness, and space for additional notes. Use this template to standardize pre line inspections and reduce rework.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
