Skip to content
SafetyCulture
Template

Precast Install Checklist

by Denis Lovric, from the Community

Downloads: 10+
Get this template

This precast install checklist supports safe, accurate panel installation on construction sites. It covers prestart items such as establishing an exclusion zone, completing the EWP logbook and toolbox talk, and confirming slab strength for braces. The installation section guides teams to set panels to survey marks, keep vertical plumb within 8 mm and face alignment within 5 mm, secure minimum restraint fixings, and lock or remove unused props. It prompts checks for transport or erection damage, correct dowel placement and lengths, and grouting of dowel voids and beds per manufacturer recommendations with plastic laid prior to mixing. It also includes housekeeping, delay reporting, verification against drawings, and site and contractor sign offs.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.