A structured checklist for A190.1 Precast Floor Slab works covering pre-installation and installation quality. Verify concrete beams and second-phase brickwork are complete, approved slab design drawings are on site, and the area is clean. Confirm adequate slip joints per specification, correct installation per drawings, cantilever sections, and ceiling levels. Reinforce good housekeeping, required PPE, and an up-to-date safety file. Capture subcontractor and foreman details, dates, and signatures to document approvals and completion.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.