This pre-site visit report template helps construction teams prepare for upcoming work, with a focus on structural steel and decking activities. Record primary and secondary site contacts with roles, phone numbers, and email addresses. Plan offloading and landing of decking packs, including delivery status, orientation, unloading facilities (crane, forklift, site labor), and responsibilities for loading onto steel. Use the decking installation checklist to verify safe access and egress, clear working areas, perimeter and internal edge protection, safety netting feasibility and alternatives, distances to floor, noise restrictions, induction times, and onsite parking. The shear stud installation checklist covers requirements for studs, cleaning primer or paint from steel flanges, welding rig reach and earthing within 7.5 m, removal of obstructions, and lifting equipment for 200 kg stud barrels. Includes sections for client comments and signature confirmations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
