Skip to content
SafetyCulture
Template

Post Install Report - Roof Works Only V5

by Bilal Islam, from the Community

0
Get this template

Use this post-installation checklist to document and verify roof works for solar PV. Capture scaffolding safety, pre-install roof conditions, tile measurements, and loft condition. Record hooked and railed stages, cable routing and securing, stringing and optimizers, clearances from borders and ridge, rail overhangs, bird netting, and under-panel photos. Confirm watertightness, rectify damages, clean the site, and obtain sign-off in line with MCS guidelines.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.