Skip to content
SafetyCulture
Template

Roof Works Post-Install Report Checklist (V4)

by Bilal Islam, from the Community

Downloads: 0
Get this template

This V4 post-install report checklist helps teams document roof works for solar PV installations. It covers scaffold health and safety and RAMS, pre-install surveys of target roofs, tile measurements, roof orientation, and loft inspections. During install, it captures hooks and rails, DC cable entry, neat connector management, and videos of each array. Post-install steps include array spacing and rail overhang checks, clamp measurements, bird netting, optimizer serial mapping, jumper cable securing, ground photos, and final declarations, site cleanup, ladder guard, and customer sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.