Places for People Landscapes LoLER Safety Checks
by Kymberley Havard, from the Community
This document outlines a detailed safety inspection system for climbing and lowering equipment, featuring a structured weekly checking system across five weeks. It includes tracking of LOLER (Lifting Operations and Lifting Equipment Regulations) test dates, equipment IDs, and inspection schedules. The form provides spaces for daily verification of safety checks, documentation of faults or damage, equipment quarantine confirmation, and management reporting. It also maintains records of new and withdrawn equipment, ensuring complete traceability. The document concludes with a formal confirmation section requiring team leader verification that all equipment has been properly inspected and is fit for use, with appropriate actions taken for any defective items. This system helps organizations maintain compliance with safety regulations and ensure proper equipment maintenance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.