Permit to Dig

by Paulina Ryan, from the Community

Downloads: 80+
Get this template

To be filled out be a Foreman / Supervisor for every site before you dig greater than 300mm below original ground level. Permit to dig is to be completed BEFORE work begins. NOTE: For all trenches over 1.5m deep a Trench / Excavation Inspection Form must also be completed. If the answer to any item on this checklist in 'No', then work cannot proceed until the relevant item has been completed, or the risk assessed and the hazard mitigated. Note details of the mitigation once resolved. EXCEPTION A Permit to Dig is not required for hand digging or hydro-excavation, provided the task is assessed as Low Risk, and insulated hand tolls are used.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log
Click below to load the preview and explore the details.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.