To be filled out be a Foreman / Supervisor for every site before you dig greater than 300mm below original ground level. Permit to dig is to be completed BEFORE work begins. NOTE: For all trenches over 1.5m deep a Trench / Excavation Inspection Form must also be completed. If the answer to any item on this checklist in 'No', then work cannot proceed until the relevant item has been completed, or the risk assessed and the hazard mitigated. Note details of the mitigation once resolved. EXCEPTION A Permit to Dig is not required for hand digging or hydro-excavation, provided the task is assessed as Low Risk, and insulated hand tolls are used.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.