Skip to content
SafetyCulture
Template

Permit to Break Ground Rev 2

by David Burton, from the Community

Downloads: 10+
Get this template

Use this permit to break ground template to control excavation activities on site. Capture project details, permit number, dates and times, and planning and preparation requirements before digging. Confirm method statements, risk assessments, drawings, and GPR surveys; record utilities such as electric, gas, water, and communications; and assess temporary works and supports. Require competent supervision, safe digging per HSG 47, and the use of locating devices and trial holes. Authorize work after services are exposed, communicate permit requirements to the crew, and formally clear and cancel the permit when the area is made safe.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.