Use this template to document CWCT TN41 hose testing on curtain walling and window assemblies for net zero facades. Capture site details, locations, and observations while applying the prescribed 22 ± 2 L/min water flow with a 30° cone nozzle, progressing across joints as specified. Include photos or media, note any leakage or water ingress, and continue inspection for 30 minutes post-test. Summarize results, record defects and corrective actions, and finalize with a conclusion and sign-off to verify facade performance and compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
