Skip to content
SafetyCulture
Template

NCH Pre PCI Construction Inspection Checklist

by Brad Huizenga, from the Community

Downloads: 0
Get this template

This free Pre PCI construction checklist helps site managers and homeowners review a build before practical completion and handover. Record job details including job number, address, date, and stage of construction. Inspect external elements such as front elevation, portico or porch, sides, rear, alfresco, and garage, then work through internal rooms including entry, study, kitchen, pantry, dining, living, theatre, laundry, master bedroom, ensuites, walk in robe, bathrooms, WC, and additional bedrooms. Rate each area as good, average, poor, or not applicable, and add notes and photos where needed. Finish with general comments and collect digital signatures from the client and supervisor to confirm readiness for PCI.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.