Use this mobile crane lift plan checklist and method statement to verify safe crane operations before any lift. Based on British Standard 7121-1:2016, the template guides pre-planning, defining the load, center of gravity and stability, access routes, ground conditions, and crane selection. On-site checks cover outriggers, packing and base, lifting accessories and SWL, operator details and competence, and visual inspections. It prompts RAMS verification and sign-off, role allocation (appointed person, crane supervisor, operator, slingers/signallers), environmental limits such as wind speed, working at height arrangements, and communication methods. A final review by the health and safety or site manager is required before the lift proceeds.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
