Use this Mitsubishi Ecodan commissioning checklist to verify correct installation and setup of heat pumps and hot water systems. Sections cover pre-commissioning notes, central heating controls and zoning, thermostatic radiator valves, safety interlocks, sensor placement, weather compensation, and third‑party control interlocks. Validate system fill, pressure testing, flushing to BS7598, expansion vessel sizing and charge, antifreeze type and concentration, legionella protection, pump speed settings, and target flow/return temperatures. Inspect outdoor unit mounting, airflow clearance, insulation, isolation valves, and condensate management. Confirm hot water G3 requirements including PRV, tundish and discharge pipework, thermostat settings, flow rates, blending valves, and compatibility with additional heat sources. Ensure end‑user demonstration, documentation, and Building Regulations compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
