JCD-QMS-QAC-020 Fire Doors Inspection Checklist
by Alex Dobra, from the Community
This JCD-QMS-QAC-020 Fire Doors Inspection template guides site supervisors and managers through compliant fire door installation and verification. It covers Stage 1 and Stage 2 activities, from frame alignment, fixings, tolerances and trimming, to sealants, signage and drop seals. It includes fields to record door details, ratings, manufacturers, installers and sign-offs for both JC Drylining and the main contractor, and references BS 8214:2016, BS 476:2022 and BS EN 1366-4:2021.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
