Skip to content
SafetyCulture
Template

MF Ceilings Quality Assurance Checklist

by Alex Dobra, from the Community

Downloads: 10+

This MF ceilings quality assurance checklist supports onsite inspection and sign-off for metal frame ceiling installations. It covers prerequisites and installation steps including surface and weather conditions, FCL verification, rigid angle hangers at 1200 mm centres, MF6 perimeter channel fixing at 600 mm centres, MF7 primary support channel fixings, MF5 ceiling furring channel centres and overlap, correct engagement into MF6, pattress installation, plasterboard laid 90 degrees to MF5 with correct board type, and coordination to avoid clashes with services. The form includes cleanliness and damage checks, a sign off section for JC Drylining Ltd and the main contractor, plus comment fields for both parties.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.