Use this Rock Removal Report template to document rock encountered during excavation and earthworks on site. Record project and location details, chainage start and end, measurement method, and calculated length width depth and approximate volume. Select removal methods such as trencher rocksaw rock hammer excavator with ripper dozer with ripper or blasting. Log time spent, crew size, plant and truck usage, GET tools consumed or repaired, and samples taken. Note if the activity is in scope or a variation and whether the client was informed or witnessed. Add photos and complete onsite sign off to support compliance, quality assurance, and clear claims.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
