IDI Truss Installation Quality Control Checklist
by Peter Graham, from the Community
Ensure quality and safety during roof truss installation with this QAQC checklist. Verify approved shop and truss drawings, confirm use of a spreader bar, inspect trusses for shipping damage, and check correct fastener counts at truss and bearing points without over tightening. Confirm fasteners are placed in the proper clip holes, install X bracing at a maximum spacing of 20 feet, complete all bracing by end of day, and add lateral load bracing. Validate trusses are plumb and level, confirm jack truss connections to girder trusses, and recheck bracing before sheathing. Finish with site cleanup, a walkthrough with the general contractor, comments, and inspector sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
