Skip to content
SafetyCulture
Template

HMS-DC Trench and Feeder QA and QC Traveler

by James Decker, from the Community

Downloads: 10+
Get this template

Use this QA and QC traveler to audit underground trenching and feeder installation for electrical systems. Guide crews and quality managers through checks for trench width and depth per drawing E400, minimum 30 in to top of cable and 34 in trench depth, bedding aggregate no larger than 3/8 in with at least 3 in surrounding conductors, ground conductor installation, native backfill and compaction per the geotechnical report, electrical warning tape a minimum of 12 in above cables with added tape for trenches wider than 24 in, proper offsets from tracker piles, and clearances at intersections above MV AC cable. Capture photos, notes, corrective actions, assign responsibilities, and complete digital sign offs for compliance.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Trench and Feeder QA and QC Checklist for Underground Cable | Free Template