Use this Trench Report LV template to record key details of low-voltage trench works, including site location, pre-start checks, CAT scan and markings, trench layout, width and 600 mm depth, debris removal, and sand bedding. Capture installation of 50 mm2 bare copper earthing, inverter earthing connections with Denso tape, micro-ohms test results, inverter number, and photos. Include approvals and results to ensure compliance and safe installation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
