Footpath Drainage and Kerb and Channel Checklist
by Brandy Graham, from the Community
Use this civil works checklist to plan and assess footpath drainage and kerb and channel activities. Verify trench alignment, line, level and depth. Specify approved backfill materials such as GAP 65, GAP 40, AP 40, AP 20 and F2, and record staged compaction with Clegg results. Check pipe support, jointing to manufacturer specifications, discharge and manhole connections, and drainage layer heights. For footpaths, confirm subgrade CBR targets, basecourse thickness, concrete strength and thickness, surface finish, expansion joints, line marking and reinstatement of berms and surface covers. Include vehicle crossings, haunching, pointing, seeding and catchpit sealing.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
