Skip to content
SafetyCulture
Template

ES Supervised Shift Report

by Sheridan Easter, from the Community

Downloads: 0
Get this template

Use this ES supervised shift report to assess Engineering Supervisor readiness on rail worksites. Verify PPE, RAMS and toolbox talk sign off, competency cards and required documents. Capture communications with the PICOP, permissions to set up the worksite, marker board placement, and on track movements. Record sign ins, briefings, safety controls, paperwork completion and site clearance. Include supervisor notes, recommendations, and an overall competency rating.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.