This Work Inspection Record (WIR) template helps electricians and site supervisors inspect distribution boards during installation and commissioning. Capture project and location details, verify equipment positioning, isolator installation, correct glands and accessories, and paint finish. Confirm tightened terminations, phasing identification, earthing, cable markers, and neutral termination. Reduce eddy currents by routing cables through the same aperture. Add photos, notes, corrective actions, and reviewer sign-off to document compliance and quality.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
