Work Inspection Record (WIR) - Containment
by Darren Reeves, from the Community
This Work Inspection Record (WIR) template supports quality checks for electrical cable containment systems including tray, trunking, conduit and accessories. Sections cover project and location details, control points, and acceptance criteria per manufacturer recommendations and drawings. Inspect for corrosion, correct bracket positions, adequate clearances from other services, correct sizing, and deburred cuts with protection. Confirm assemblies are rigidly secured to supports, earthing is to specification, and continuity test results are recorded. Capture evidence, note defects and corrective actions, and complete reviewer name, signature and date for sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
