This Zone 3 site pre-inspection checklist helps crews record key details before utility and excavation work. Capture inspector name, date, city and neighborhood, customer contact, job type, long or short side, ground material, bellhole target, and safe meter location. Verify depth of main and explain any N/A responses. Use the site checklist to note TCP, LCT, aggregates, asphalt, saw cuts, hydrovac, shoring cage, permits, and parking. Log utility crossings for gas, hydro, fiber, telecom, water, sewer, and storm, with comments. Assess site readiness and estimate time needed. Add a freehand sketch, inspection notes, and structured photo evidence including property layout, corridor shots from tie-in to SML, obstacles, surroundings, overhead hazards, and extra photos.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
