Durban Resignalling Construction Progress Report
by Slow Mo, from the Community
This construction progress report template is designed for the Durban rail resignalling program. Capture phase and station details, select workstreams including signalling, telecomms, trackwork, mains and OHTE, signalling power supply, and civil. Log milestone activities with photos and status, key risks with mitigation, issues with resolution and ownership, and materials on site. Plan next week’s key events and record health and safety observations covering PPE, environmental controls, welfare, and housekeeping. Conclude with schedule status and site representative comments and signatures.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
