This Concrete Pour Form template helps construction teams document each pour from start to finish. Record project and pour location, time and temperature, mix design and engineering specs, target air content and slump, and maximum temperature. Log total yards poured, batch and end times, number of trucks, truck tickets, and testing frequency. Capture key QA data including air entrainment, slump, and temperature with supporting photos of gauges. Note whether a pump truck, tremie or elephant trunk, and vibration were used, and whether the hole was dry or watered, including water depth and any water added. Track cylinders made for compressive testing and add comments for issues encountered. Obtain inspector and customer representative signatures for final sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
