Skip to content
SafetyCulture
Template

Crestron Systems Pre and Post Bathroom Works Checklist

by Kevin Yarroll, from the Community

0
Get this template

Use this Crestron systems test and report checklist for pre and post bathroom works in apartments. Confirm installation and operation of door access, door frame camera, electronic lock, touch panels TSW-560P and TSW-750, lighting and blinds, AV racks and plates, kitchen and living room lighting, bedroom and en suite controls, underfloor heating, towel rails, mirror demisters, ceiling speakers, heating FCU control, iPad control, and final sign off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.