This Bonefish dredge pre-startup checklist guides crews through critical pre-operation checks and ongoing maintenance. It covers lubrication points for swing sheaves, ladder trunnions, winches, U-joints, and service water pumps; inspection of wear components such as cables, hydraulic hoses, V-belts, and piping; and verification of fuel, cooling, guards, and foundations. Safety equipment checks include fire extinguishers, life ring, VHF radio, navigation lights, day shapes, horn, and bilge pump. Includes generator checks and maintenance intervals at weekly, 250 hours, monthly, 1000 hours, 2000 hours, and annual.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
