Contractor Proposal EPDM Remedial Works Quality Plan
by Paul Chiritoi, from the Community
This contractor proposal template covers EPDM installation to a floor slab with a practical quality plan and defined hold points. It outlines pre-start checks, including visual inspection of concrete and masonry, minimum temperature and relative humidity requirements, and surface preparation with ARBO primers and adhesives. Steps detail adhesive application, EPDM placement and rolling, and edge treatment. Scope notes limit application to clear floor slab zones only, excluding areas above or below window pods. Final sign-off is by the site or QA manager.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
