Use this production weld checklist to audit pipeline welding activities. Verify welder certifications, correct WPS selection for pipe grade and wall thickness, materials on hand (6010/7010/8010/7018), and required tools. Capture JHA and hot work completion, pre-heat temperatures, bevel preparation, and conformance to PG&E standards. Record visual acceptance criteria for undercut, high spots, cold lap, pinholes, and weld profile. Note inspectors present, stencil IDs, and drawing conformance to ensure quality and safety.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
