Skip to content
SafetyCulture
Template

General LED Installation Checklist for Barangaroo FW4 WBC

by Stephen Roberts, from the Community

Downloads: 0
Get this template

This checklist supports Phase 2 hardware installation for General LED rooms at Barangaroo, Westpac Tower 2 FW4. It guides technicians through installing and verifying in-wall TV brackets with power and data, IPTV device setup and patching, LCD/LED screen alignment and cleanliness, and ensuring the space is clear with no visible cabling. Includes fields for level, room names, personnel, conduct date, and Lend Lease sign-off to confirm acceptance.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .