This ASHP technical survey checklist helps installers and surveyors assess a site before fitting an air source heat pump. Capture photos of the service loop, electric meter, and earthing; record supply type, maximum demand and capacity (Amps/kVA), and phase. Verify fuse board compliance and existing fuel, heating emitters, and DHW supply, noting any other renewables on-site. Plan the new installation by selecting proposed heat emitters and preferred ASHP make and model, and confirm locations for the unit and cylinder. Determine the need for auxiliary heating and metering, and check for any Building Regulations implications or customer preferences. Attach floorplans and parts lists to complete the technical survey.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
