Use this quality assurance checklist to inspect and sign off window fire barriers at Harrow Depot. Record project details such as main contractor, project number, QA sheet number, elevation, and level. Verify that 0.7 mm Prisma plates are continuous across cill and jamb on twin skin SFS and are secured at 600 mm centres with stainless steel rivets. Check that 100 mm RWA45 rockwool is installed without gaps between head track and lintel on all windows. Add photos, notes, and corrective actions, assign responsibilities and due dates, and capture installer, A2O, and client signatures before completion.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
