Use this A250.1 Electrical Slabs checklist to plan and verify electrical floor fix work before concrete is poured. Confirm approved drawings are on site, determine light, switch and plug locations, and size and route conduits including 50 mm to the distribution board. Ensure conduits match the drawings, are secured and blocked off for the pour, and that a representative is present on the pour date. Maintain housekeeping, wear required PPE, keep the safety file up to date, and complete necessary approvals. Capture site details, start and completion dates, inspector and subcontractor information, and obtain subcontractor and foreman signatures to certify works.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
