Skip to content
SafetyCulture
Template

1 Grosvenor Square AV and Lighting Commissioning

by Mark East, from the Community

Downloads: 10+
Get this template

This commissioning sign-off checklist for 1 Grosvenor Square guides engineers through verifying AV, lighting, and HVAC integration in an apartment. Tasks cover lighting groups and addressing, processor programming and time settings, keypad installation and scene controls, touchpanel connectivity and area control, doorbell termination and routing, and HVAC network status with two-way control. Includes notes, signatures, and final sign-off by Smartcomm and Core Group to confirm the apartment is fully commissioned.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

AV and Lighting Commissioning | 1 Grosvenor Square | Free Template