1 Grosvenor Square AV and Lighting Commissioning
by Mark East, from the Community
This commissioning sign-off checklist for 1 Grosvenor Square guides engineers through verifying AV, lighting, and HVAC integration in an apartment. Tasks cover lighting groups and addressing, processor programming and time settings, keypad installation and scene controls, touchpanel connectivity and area control, doorbell termination and routing, and HVAC network status with two-way control. Includes notes, signatures, and final sign-off by Smartcomm and Core Group to confirm the apartment is fully commissioned.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
