Skip to content
SafetyCulture
Template

McCarran Storm Event Assessment

by Josh McIntyre, from the Community

0
Get this template

This storm event assessment template for McCarran documents post-rain conditions across airport drainage assets, including channels, outfalls, retention basins, and connectors. Inspectors record visual indicators of stormwater quality such as color, odor, clarity, and the presence of floating, settled, or suspended solids, foam, and oil sheen, along with any other signs of pollution. Sections reference locations like Tropicana Wash Channel, North Retention Basin Outfall, Terminal 3 Basins, and the South Channel Airport Connector. Use this checklist to standardize observations after rain events and capture sign-off.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

McCarran Storm Event Assessment Checklist After Rain | Free Template