Arriva UK Bus Depot Engineering Audit 25 percent
by Mark Johnstone, from the Community
Use this Arriva UK Bus depot engineering audit to complete a 25 percent snap check of fleet and workshop compliance. The checklist covers depot fleet status, spare capacity, manning and vacancies, last audit outcomes and actions, vehicle defect cards, inspection intervals and repair closure, quality monitoring, preventative maintenance, and fire risk assessments. It also reviews stores controls including requisitions, warranty handling, and out of hours issues, engineering safety practices such as pit protection, speed limits, LEV use, safe systems of work, PPE, steering wheel covers and wheel chocks, and road wheel procedures including three stage torque checks and calibrated torque wrenches. Use it to standardize audits and track corrective actions.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
