New Area Pre-Start and Site Specific Risk Assessment
by Daniel Gray, from the Community
Use this site specific risk assessment pre-start checklist to plan new work areas and control risk before operations begin. Capture site details (client, contractor, location, date/time), discuss high-risk areas, environmental and operator issues, and emergency assembly points with GPS coordinates. Add hazards, apply a clear risk matrix, and record controls using the hierarchy (eliminate, substitute, isolate, engineer, administer, PPE). Attach photos and capture foreman and supervisor sign-offs.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
