Terex Finlay Impactor Pre Delivery Inspection
by Steven Ross, from the Community
This pre delivery inspection checklist for Terex Finlay impactor machines guides dealers and technicians through all critical checks before handover. Verify safety systems and emergency stops, perform pre start fluid and engine checks, inspect power unit, tracks, conveyors, magnets, feeders, and the impact chamber, and confirm hydraulic pressures and running speeds. Include tool and manual verification, operational folding tests, and quality feedback, then capture comments and sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
