Use this Terex Finlay conveyor commissioning form to guide safe, efficient handover. Capture dealer and customer details, machine model and serials, hour meter readings, site and material setup, and a full safety overview. Follow pre-start inspections, fluid and lubrication checks, control panel navigation, maintenance schedules, belt, track, scraper and coupling adjustments, and urea system basics. Includes site preparation, tracking, folding out, setup, starting, running, shutdown procedures, additional options, and final sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
