Use this Spitwater Client Handover Form to document equipment delivery and operator onboarding for industrial pressure cleaners. Record customer details, invoice, model and serial numbers, site conditions, and training completion. Checklist covers safety advisories, work zone precautions, and key operating steps including connections, regulator settings, nozzle care, and hot-water shutdown to reduce scale. Track parts and consumables, add photos, and note warranty registration and manuals provided. Includes service intervals (first 50 hours, then every 200 hours) and an option to enroll the customer in a preventive maintenance schedule. Capture sign-off from the Spitwater representative and the customer.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
