Snorkel In-Process Inspection Report 1433714
by Rajendra Karpe, from the Community
In-process inspection checklist for Snorkel part 1433714 Rev B. Capture the process name, part serial number, and inspection date. Record dimensional checks, axle plate hole position, and ensure BOP and child parts are fitted per drawing. Verify there are no visual defects, that welds meet specifications, and no-weld zones are respected. Confirm part stamping and freedom from welding defects. Document welding parameters including current, voltage, and gas flow, along with lug and plate pin qualifications. Includes inspector sign-off for traceability.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
