Skip to content
SafetyCulture
Template

Siler City Plant SPCC Monthly Inspection

by Patrick OSullivan, from the Community

0
Get this template

This SPCC monthly inspection checklist supports environmental compliance at the Siler City Plant. It guides designated inspectors through checks for aboveground storage tanks (ASTs) including emergency generator, on-road diesel, and 500-gallon diesel tanks, plus used oil drums. Items cover tank surfaces, bolts, seams and welds, appurtenances (level gauges, vents, fill caps, drains), foundations and supports, gauges and alarms, gaskets and O-rings, pipelines, hoses, pumps, unloading areas, connections, and both secondary and tanker containment. Inspectors verify spill response supplies per the SPCC plan, check interstice tanks for leakage, confirm no water in tanks, and assess fencing, lighting, and site drainage for sediment, puddling, or erosion. Completed logs should be uploaded to Intelex and a hard copy retained on-site for three years.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.