Use this product change over checklist to guide a thorough clean down when switching materials between runs. Inspect and clean the raw material main hopper, top and bottom feed hoppers, main expander, fluidizing bed and fan, ducting, and transfer gate. Remove residue, hoover and blow down surfaces, check feeds are clear, and capture photos at each stage. Finish with a general tidy around the expander and boiler so the line can restart quickly and safely with minimal downtime.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
