This PPAP documents checklist helps quality managers and supplier teams plan and assess Production Part Approval Process submissions. It covers design records, approved engineering changes, customer approvals, DFMEA and PFMEA, process flow, control plans, measurement system analysis, dimensional results, performance and material test results, initial process studies, qualified labs, appearance approval, sample parts and master samples, checking aids, customer specific requirements, and the part submission warrant. Use it to verify PPAP 4th edition requirements, confirm submission level and timing, and drive continuous improvement in automotive manufacturing quality.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
