Pepsi BVF-037 Supervisor Pre-Shift Checklist
by Humberto Hernandez, from the Community
Ensure production lines are ready before shift start with this Pepsi BVF-037 supervisor checklist. Review staffing and schedules, confirm raw materials and warehouse space, and verify equipment readiness across depalletizer, blow molder, labeler, rinser, filling room, seamer, packers, palletizer, and stretch wrapper. Check coding, sanitation, lubrication, utilities, and safety conditions so beverage runs start on time and meet quality standards.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
