Level 2 and 3 Layered Process Audit Checklist
by Ricky Shanes, from the Community
This Level 2 and 3 Layered Process Audit checklist supports quality assurance in manufacturing, especially automotive. It covers management reviews and logs, training and operator qualification, Level 1 and Level 2 audits, PPAP and engineering change tracking, and workstation checks for 5S, PPE, materials, BOM and control plan conformance. It includes verification of dynamic control plans, first piece approvals, quality alerts, andon response, and nonconforming material control with NCMR. Sections guide error proof verification, packaging and labeling, deviation or bypass controls, daily and final inspections including GP12, gage calibration and instructions, SPC review and reaction plans, and performance charts. Maintenance PMs, safety equipment, chemical handling per SDS, used oil and universal waste areas, storage and receiving inspection, FIFO and shipping are included, plus new employee safety and process knowledge checks with auditor sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
