This Airbus Final Assembly Line Gemba Walk checklist helps supervisors review FAL footprints across stations ST 48, ST 42 front and back, ST 41 back, ST 40 left and right, ST 35 left and right, and ST 25 left and right. Verify MDU locations match the correct MSN and station, consolidate MDUs to save space, count empty units to pick, and confirm alignment and housekeeping. Capture photos of areas or issues, note rework performed and by whom, and identify tooling to pick. Use it to support lean practices, 5S, material flow, and continuous improvement on the assembly line.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
