Skip to content
SafetyCulture
Template

Airbus Gemba Walk FAL Footprints Checklist

by Steven Nevoux, from the Community

Downloads: 0
Get this template

This Airbus Final Assembly Line Gemba Walk checklist helps supervisors review FAL footprints across stations ST 48, ST 42 front and back, ST 41 back, ST 40 left and right, ST 35 left and right, and ST 25 left and right. Verify MDU locations match the correct MSN and station, consolidate MDUs to save space, count empty units to pick, and confirm alignment and housekeeping. Capture photos of areas or issues, note rework performed and by whom, and identify tooling to pick. Use it to support lean practices, 5S, material flow, and continuous improvement on the assembly line.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .