This Factory Acceptance Test (FAT) form helps manufacturers and suppliers verify equipment completeness, safety, and performance before shipment. The checklist covers machine suitability, general appearance, electrical and mechanical compliance, guarding and interlocks, signage and labeling, dry runs, full-speed trials, and recovery from power failure. It also includes PUWER and CE considerations, HMI language settings, E-stop tests, and documentation requirements such as schematics, manuals, and backups. Use this template to standardize FAT procedures and ensure readiness for commissioning.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
