This Chip Pump I06V template streamlines pump repair and maintenance. Record MSP number, date, and technician details; capture pre-work photos, note failure mode and damages, and check shaft run-out prior to disassembly. Follow assembly steps for liner (421) and suction casing (416), take bearing location measurements, verify stuffing box and sleeve tolerances, inspect mating faces, lubrication lines, and threads, and document any impeller trailing edge modifications. Attach regrinding and crack test photos to complete the work order.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
